Accessories
Mounting structure, cable, connectors, breakers and charge controllers explained.
The stand holds the panels in sea wind, heat and rain for decades. It is the part buyers check least and regret most.

The stand carries the weight of the panels and the force of the wind on a large flat surface. A panel acts like a sail, so a gust pushes and lifts it.
Karachi adds salt air, humidity of about 61 percent on average and summer heat. Mild steel with a thin coating can rust through faster on the coast than inland. A poor stand can fail in a storm, or loosen slowly until panels shift.
That is why the structure deserves as much attention as the panels.
Prices are per panel or per set, and change with steel and aluminium costs.
| Item | Detail | Price (PKR) |
|---|---|---|
| Mounting structure | Per panel, galvanised or aluminium | Rs 6,000 floor-mounted |
| Raised structure for tank access | Per panel, extra height | Rs 15,000 |
| L2 bracket, 2 plates | Sloped roof fixing | Rs 3,500 |
Prices updated on 22 October 2026. Prices change often, so contact us for the latest exact price.
Both can work. They differ in weight, rust behaviour and cost.
| Point | Hot-dip galvanised steel | Aluminium |
|---|---|---|
| Strength | High | Good, depends on the profile |
| Weight | Heavier | Lighter |
| Rust | Zinc coating protects, but cut ends and welds need care | Does not rust, but can corrode at contact with other metals |
| Cost | Often lower for large frames | Often higher |
| Best for | Large flat roofs and tall frames | Sloped roofs and light loads |
The quality of the coating and the build matter more than the metal name. Ask for coating thickness or a make-and-finish description.
A fixed tilt close to the latitude of Karachi suits year-round output, and panels should face south. Your installer can refine this for your roof.
A flat roof lets you choose the tilt. A sloped roof usually fixes it. In both cases, leave space between rows so one row does not shade the next in the morning and afternoon.
These decide how long it lasts.
On many Karachi roofs the water tank, stair room and parapet shade the panels. A raised frame can lift the array clear of shade and leave a path underneath. It uses more steel, so it costs more. Ask for a shade check at the survey. The installation cost guide shows how height changes the price.
Short answers. For your own property, send us your electricity bill and roof details.
Ask on WhatsAppIt depends on material, height and the panel count. We quote it as a line in your itemised estimate.
Both can work if well made and well coated. Check bolts and anchoring as well.
A fixed tilt near the latitude of Karachi suits year-round output. Your installer can refine it.
If designed and anchored properly, yes. Ask how it is fixed to the roof.
Yes. Tell us the panel size and count and we will quote it.
Mounting structure, cable, connectors, breakers and charge controllers explained.
What sets solar installation cost, what a quote should include and approval costs.
Longi Hi-MO panels, large-format sizes and how to fit them on a Karachi roof.
3 kW, 5 kW and 6 kW systems: output, roof area, loads and quote checks.
Send a photo of your roof and the panel size you plan. We will quote the right structure with a free estimate.